The Bowker Centre
Client: South Staffordshire College
Architect: MCMa
We worked alongside MCMa Architects to develop the proposals from RIBA Stage 2 to completion for the new build animal care centre.
For the Animal Care Facility, we helped the design team to develop a site-responsive design, sustainable proposal that utlised modular SIP panel construction. This system was selected for energy efficiency and rapid on-site assembly, reducing disruption to campus operations.
