The Green Energy Centre
Client: South Staffordshire College
Architect: MCMa
We worked alongside MCMa Architects to develop the proposals from RIBA Stage 2 to completion.
Providing the structural designs for the new training facilities to be housed within the existing portal frame building. We supported the Architect through planning and the Contractor through the construction process by reviewing archive information, advising on structural investigations, utilising and justifying the existing structure where possible and designing new structure where required.
